Why the sample is approved before bulk
Bulk repeats the approved sample. If nothing is approved, bulk has nothing honest to repeat.

The fastest way to waste a production run is to treat the sample as a courtesy. The sample is the contract you can hold. It is the color, the assembly, the pack, and the defect list you are willing to live with. Bulk that starts from a chat message instead of an approved piece will drift, and the drift will look like a surprise only to the people who skipped the approval.
This is the same sequence for a brick set, a squishy, a vinyl figure, or a direction from the showcase. The object changes. The rule does not.
What the sample is for
A sample answers a question you name in advance. Fit, color, odor, a logo, a booklet, a tray: pick the question. When the piece arrives, check that question first. Then look for anything that would make the goods unsellable even if the question was answered. A perfect logo on a figure that cannot stand is not an approval.
Write the result down. 'Approved', 'approved except the lid color', or 'rejected, scent' are useful sentences. 'Seems ok' is not. If several people in your company must agree, make them agree on the same piece, not on a forwarded photo of a piece one of them saw.
The golden sample
The golden sample is the approved piece that production and inspection are measured against. It should be identified, kept, and not replaced by a nicer later sample that nobody signed. If you keep one and we keep one, say so. Two goldens that are not the same piece will start an argument you could have avoided.
The golden sample includes the pack when the pack is part of what you sell. A figure approved without its tray is only half approved. A brick set approved without the booklet is only half approved. If the pack artwork is late, bulk of the empty product is not a clever head start. It is a warehouse of goods you cannot label.
Changes after approval
A change after approval is a new approval, even when it feels small. A different pantone, a moved logo, a thinner card, an added accessory: each one can affect tooling, print, packing, and any test you asked for. We will not slide it into the run to be helpful. Helpful, in this case, is stopping.
If the change is accepted, the quotation and the inspection standard move with it. Pre-shipment inspection compares the goods with the current golden sample, not with the first one. In-line checks during the run do the same. If you want to understand how that sits next to freight and terms, the ordering guide is the map.
What we need from you
Name the approver. Name the question. Say whether a test report is required before bulk. Send references you actually own. When the sample arrives, respond with a decision rather than a new wish list mixed into the old one. A wish list can be a new brief. It should not be disguised as comments on an approval.
When you are ready to start that sequence, send the brief. Tell us what the sample must prove. We will tell you what we can sample, and what has to wait.
People ask us to skip the sample when they have bought 'the same thing' before. The same photograph is not the same tool, the same paint lot, or the same pack. If the previous golden sample still exists, send it or describe its identity. If it does not exist, we start again. A memory of a good order is not an approval. The new run deserves its own piece on the table, checked by the person who will have to explain the goods if they are wrong.
Keep a simple record: what was approved, on which date, by whom, and which file or piece it refers to. You do not need a formal system. You need to be able to answer, later, 'which sample is the bulk supposed to match?' If that answer takes a meeting, the record was not simple enough. Inspection will ask the same question. Give them the same answer you would give your own retailer.